The Energy Saving Project of 2011

 

It was decided that the Village Hall would only provide a viable Community venue if the costs of running it were reduced dramatically. Therefore a sub-committee was formed to try and secure funding and also raise money by putting forward various fund raising events. As ever the community responded and were very generous. Goodrich Village Hall is now an “Eco Hall” even though the building was built in 1888!

There is now a 4.32kwp ‘Photvoltaic’ Solar Array, capable of producing 3,456 kwh of electricity per year, and a 3 panel evacuated tube ‘Solar Thermal’ array capable of producing 2,500 kwh of energy per year.

Please see more information about this project at: Good Village Hall Energy Project 2011

We would like to thank the following organisations for grants received:

Double Glazing – Severn Waste Environmental Fund

Solar PV Panels – LCBP & CSEP

Solar Thermal Panels – LCBP & CSEP

Air Source Heat Pumps – LCBP & CSEP

Cavity Wall & Loft Insulation – LCBP & CSEP

Suspended Ceiling – Herefordshire ‘Grass Roots’ Fund

Insulated Wooden Floor – Lottery ‘Awards for All”